Overhaul Of The Main Engines On Board Smyril

19.05.2018

On May 22nd we will start an overhaul of 1 of the main engines on board Smyril
For 3/4 weeks delays and changes might occur because we will be sailing with 3 main engines in connection with the overhaul.